Improvements

Improvements and Renovations to PSTC 

 

PHASE I (2007): CLUBHOUSE RENOVATION; NEW WADING POOL & SHADE STRUCTURES

 *BATHHOUSE RENOVATED INSIDE AND OUT

*Exterior

  1. Roof and Trim Painted
  2. Tile removed from siding
  3. Complete New Dryvit/Stucco Siding
  4. Electrical Wires Reconfigured
  5. New Doors
  6. New Walkway through Office Area
  7. New Pull Down Doors for Office
  8. New Breezeway Gate
  9. Repair/Paving of Unfinished Portion of Circular Driveway
  10. Pump Room Structural and Mechanical Repairs

*      Interior 

  1. Floors Tiled
  2. Locker Room Walls Tiled Up To Eight Feet
  3. Remaining Walls and Ceilings Painted Including Office/Kitchen/Tennis Office
  4. New Lockers
  5. New Benches
  6. New Sinks, Counters, Showers, Toilets, and Partitions
  7. Improved Bathhouse and Tennis Office Lighting
  8. New and Additional Ceiling Fans
  9. New Office Tile Floor, Fans, Counters, and Desk
  10. New Kitchen Tile Floors, New Counters, Cabinets, and Sink
  11. New Display Boards

*    TWO SHADE STRUCTURES

*      Replacing Former Pavilion with Two (2) New Shade Structures

  1. Shade Structure Straddling Fence Separating Wading Pool and Adjacent Deck
  2. Shade Structure Located Above Stone Wall: Centered On Main Pool

*    NEW WADING POOL AND SURROUNDING DECK

*      New 30' x 20' Wading Pool with New Heater & Beach Entry

  1. Modest Water Bubbler Feature
  2. Related Retaining Wall
  3. All New Decking
  4. New Pool Furniture (Phased In) 

PHASE II (2008): RENOVATION/ENHANCEMENT OF MAIN POOL; SHADE STRUCTURES

*      MAIN POOL

  1. Pool Lengthened by 7-8 Feet and Current Shallow End Deepened
  2. To Accommodate More Recreational Opportunities Simultaneously (lap swimming, diving well, and shallow end activities)
  3. U-Shape to Pool
  4. New Shallow End with in-water seating
  5. New White Coat Renovation
  6. New Tile, Coping, Ladders, and Trim Renovation
  7. Pump Room Mechanical Renovations

*      SHADE STRUCTURES

  1. New, large waterproof shade structure
  2. Shade structure installed adjacent to snack bar

PHASE III (2011): REPLACEMENT OF TWO TENNIS COURTS WITH THREE TENNIS COURTS AND SEASONAL BUBBLE FOR INDOOR WINTER TENNIS; TENNIS OFFICE AND FACILITIES BUILDING