Improvements and Renovations to PSTC
PHASE I (2007): CLUBHOUSE RENOVATION; NEW WADING POOL & SHADE STRUCTURES
BATHHOUSE RENOVATED INSIDE AND OUT
Exterior
- Roof and Trim Painted
- Tile removed from siding
- Complete New Dryvit/Stucco Siding
- Electrical Wires Reconfigured
- New Doors
- New Walkway through Office Area
- New Pull Down Doors for Office
- New Breezeway Gate
- Repair/Paving of Unfinished Portion of Circular Driveway
- Pump Room Structural and Mechanical Repairs
Interior
- Floors Tiled
- Locker Room Walls Tiled Up To Eight Feet
- Remaining Walls and Ceilings Painted Including Office/Kitchen/Tennis Office
- New Lockers
- New Benches
- New Sinks, Counters, Showers, Toilets, and Partitions
- Improved Bathhouse and Tennis Office Lighting
- New and Additional Ceiling Fans
- New Office Tile Floor, Fans, Counters, and Desk
- New Kitchen Tile Floors, New Counters, Cabinets, and Sink
- New Display Boards
TWO SHADE STRUCTURES
Replacing Former Pavilion with Two (2) New Shade Structures
- Shade Structure Straddling Fence Separating Wading Pool and Adjacent Deck
- Shade Structure Located Above Stone Wall: Centered On Main Pool
NEW WADING POOL AND SURROUNDING DECK
New 30' x 20' Wading Pool with New Heater & Beach Entry
- Modest Water Bubbler Feature
- Related Retaining Wall
- All New Decking
- New Pool Furniture (Phased In)
PHASE II (2008): RENOVATION/ENHANCEMENT OF MAIN POOL; SHADE STRUCTURES
MAIN POOL
- Pool Lengthened by 7-8 Feet and Current Shallow End Deepened
- To Accommodate More Recreational Opportunities Simultaneously (lap swimming, diving well, and shallow end activities)
- U-Shape to Pool
- New Shallow End with in-water seating
- New White Coat Renovation
- New Tile, Coping, Ladders, and Trim Renovation
- Pump Room Mechanical Renovations
SHADE STRUCTURES
- New, large waterproof shade structure
- Shade structure installed adjacent to snack bar
PHASE III (2011): REPLACEMENT OF TWO TENNIS COURTS WITH THREE TENNIS COURTS AND SEASONAL BUBBLE FOR INDOOR WINTER TENNIS; TENNIS OFFICE AND FACILITIES BUILDING